Executive Summary

This project involved the comprehensive process of diagnosing and replacing a commercial boiler with a new high-efficiency unit. The job was a resounding success, meeting our client’s needs within their budget and installing a powerful boiler capable of handling the high output demands of a car wash. MSP turned these challenges into an opportunity to exceed our customer’s expectations, resulting in a highly satisfied client who now experiences fewer work order calls and reduced plumbing repair costs.

Client Needs & Objectives

  • Challenge Overview: Our client faced constant mechanical and plumbing issues due to inadequate preventive maintenance on their boiler. MSP accurately diagnosed the problem with the older unit, finding a cracked heat exchanger. After a thorough discussion, a quote for a new boiler installation was provided and approved, leading to the commencement of the project.

Our Solution

With time sensitivity in mind, MSP completed the job within the customer’s budget and timeframe. Our strong relationship with Lochinvar, a local company, enabled us to source the ideal boiler for the specific needs of their car wash.

Project Highlights

  • Key Figures: Lochinvar FTXL 400,000 BTU Boiler.
  • Major Components Installed: A commercial boiler compliant with the Universal Plumbing Code (UPC).

Performance & Efficiency

The installation of the new Lochinvar boiler has made it the highest-performing unit across all seven of our client’s locations. This success is attributed to the boiler’s efficiency rating and the reduced need for service calls.

Safety & Compliance

Our team prioritized safety, reflecting MSP’s commitment to professionalism. All technicians involved are OSHA certified and trained to handle hazardous environments. The project was completed without any injuries.

Project Management & Execution

  • Timeline: The project, from initial diagnosis to completion, spanned five full labor days.
  • Budget Compliance: The project was completed within the approved budget.
  • Adaptability: Installing the new boiler was technically challenging due to its location on a second-floor mezzanine, requiring the use of a hand crane for the removal of the old unit and installation of the new one.

Final Outcomes

  • System Commissioning: Post-installation, we verified the proper functioning of the system, including ventilation connections and natural gas safety. We also ensured that the water reached the desired temperature.
  • Client Satisfaction: The client was extremely pleased with the new installation, leading to an ongoing professional relationship.
  • Post-Installation Support: We arranged for the boiler’s warranty on-site, ensuring our client was prepared for any future issues.